Capability Profile · Aviation & Airport Development

Regional Airport
Capability

Arup’s airport design, engineering and delivery record in Southeast Asia — prepared as evidence of the capability available to a development consortium working in the region.
November 2026 Prepared for consortium evaluation
This document summarises Arup’s published project record and corporate information. It is provided as capability evidence for the proposed consortium and does not constitute an offer, appointment or commitment by Arup. Project imagery is published by Arup or Changi Airport Group and is credited on the final page.
01 · Purpose

Why this profile exists

The partnership assembling this consortium is not itself a construction or engineering contractor. Its role is to structure and govern a competitive delivery process through which the client can select the strongest combination of international design and engineering expertise, regional construction capability and local delivery — then to hold that consortium together through delivery.

For that model to be credible, the client needs evidence that the Western anchor of the consortium can actually deliver airports in this region at the scale and standard required. This document provides that evidence for Arup, the British engineering and design consultancy that the partnership is positioned to convene as the proposed lead designer and engineering partner.

What this document evidences

How to read it

The case studies are drawn from Arup’s own published project record and from client announcements. They demonstrate what the firm has actually been appointed to do in this region — not what it proposes to do. Sections describing the Laos engagement are factual: they record published agreements and procurement positions, and make no claim about outcomes.

Status of the relationship

Arup is a member of the British Aviation Group (BAG), the UK aviation industry body whose Airport Consultants Group promotes member firms internationally. The partnership’s role is convening and governance; appointment of any consultant, contractor or consortium leader remains a decision for the client at the appropriate project stage.

Arup — Regional Airport Capability · ASEAN02
02 · The firm

Arup at a glance

1946
Founded, London
~16,000
Planners, designers, engineers & advisors
140
Countries of operation
70+
Years in aviation development
100+
Airports with aviation assignments
Employee-owned
Independent partnership structure

Arup is an independent firm of planners, designers, engineers and consultants, founded in London in 1946 and owned by its employees rather than external shareholders. The firm describes itself as a collective of approximately 16,000 professionals working across 140 countries.

In aviation, Arup states that it has been involved in aviation development for over 70 years, with assignments at more than 100 airports worldwide, and that it has advised the majority of the world’s leading airports. It is recognised as a global leader in airport masterplanning, terminal and support-facility design, and specialist aviation services.

Aviation credentials in one line

From masterplanning and feasibility through terminal and airfield engineering, digital passenger systems, baggage handling, operational readiness and sustainability — Arup covers the full lifecycle of an airport asset, from first strategic study to opening day and beyond.

JetBlue terminal at JFK airport
JetBlue JFK Terminal 5 — one of Arup’s recent terminal projects in the United States. Image: Arup.
Arup — Regional Airport Capability · ASEAN03
03 · Capability

What Arup does on airports

Arup’s aviation work spans the entire airport lifecycle — from strategic masterplan to detailed engineering, systems integration, operational readiness and long-term asset management.

Airport design and infrastructure

Physical design of airport structures at every scale: control towers, passenger terminals, cargo and maintenance facilities, and airfield assets including runways, taxiways and aprons. The practice states it has worked at the leading edge of aviation infrastructure design for over 60 years.

Planning and masterplanning

Strategic and commercial planning for airport owners, operators, developers, airlines and regulators — long-term masterplans, mid-term capital investment plans, feasibility studies and planning submissions, at scales from regional airports to capital-city hubs.

Airport systems and operations

Operational performance consulting, asset management, baggage handling systems, passenger information systems and logistics strategy. Independent advisory across planning, design and implementation.

Operational readiness (ORAT)

A defined Arup service: preparing airport operators for successful opening day — trials, staff training, transition planning and cutover management for new terminals and facilities.

Safety, sustainability and future mobility

Security and risk planning; decarbonisation and energy strategy for airport estates; and emerging areas including advanced air mobility and hydrogen readiness.

Range statement

Arup states its aviation experience ranges “from many of the world’s largest international hubs to award-winning smaller regional airports” — the scale band within which Lao regional airport projects sit.

Sources: arup.com — Aviation market page and Aviation Services (accessed Nov 2026); Arup in Aviation 2025 brochure.
Arup — Regional Airport Capability · ASEAN04
04 · Regional presence

A dedicated aviation team for the region

Arup does not serve Southeast Asia from London. It maintains a permanent regional aviation organisation led from Singapore and Hong Kong, with named business leaders for Southeast Asia and Australasia.

Regional aviation leadership

RoleLocation
Global Aviation LeaderNew York, USA
Asia Pacific (APAC) Aviation LeaderHong Kong
Aviation Business Leader, Southeast AsiaSingapore
Aviation Business Leader, AustralasiaSingapore

Arup Singapore

Established in 1968, Arup’s Singapore office employs more than 350 professionals across specialist disciplines and has delivered landmark Singapore developments including Marina Bay Sands and the Helix. The office serves as the regional aviation hub.

Current flagship engagement

Arup’s Singapore aviation team has been part of the Master Building Consultants for Changi Airport Terminal 5 since 2023, leading design integration across specialist engineering disciplines and airport planning — one of the largest airport projects anywhere in the world.

UK industry standing

Arup is a member of the British Aviation Group and its Airport Consultants Group — the UK body representing aviation design, engineering and consultancy firms internationally.

Aircraft at an airport at night
Regional aviation is a standing practice area, not a project-by-project outreach. Image: Arup.
Sources: arup.com — Aviation Services experts, Arup Singapore office page, Arup news (accessed Nov 2026); Changi Airport Group appointment announcement, Apr 2018.
Arup — Regional Airport Capability · ASEAN05
05 · Portfolio

ASEAN airport projects

Four Arup engagements in Vietnam, Singapore and Laos form the core of its ASEAN airport record. Wider regional credentials follow the table.

Airport / programmeCountryArup roleStatus
Long Thanh International Airport — terminal buildingVietnamStructural & civil engineering, detailed designIn development
Changi Airport Terminal 5SingaporeMaster Building & Master Civil consultant — engineering consortiumGroundbreaking May 2025; opening mid-2030s
Changi Airport Terminal 4SingaporeIIDS engineering, PM, tendering & ORAT; façade engineeringOpened Oct 2017
Laos airport programme — PSVG feasibility study; Luang Prabang PPP bidLaosConsultancy partner to Phongsavanh GroupFeasibility agreement 2022; PPP prequalified 2025

Wider regional credentials

Why this matters for Laos

The Laos engagements make Arup the only member of the British Aviation Group with a documented, minister-witnessed working relationship inside Lao airport development — and the only one that has taken a Lao airport project to PPP prequalification.

Sources: arup.com project pages; Vientiane Times, 14 Sep 2022; MPWT procurement notices (see Credits page).
Arup — Regional Airport Capability · ASEAN06
06 · Case study — Vietnam
01

Long Thanh International Airport

Dong Nai Province, Vietnam · Client: Airports Corporation of Vietnam
Long Thanh International Airport terminal render
Long Thanh terminal — the “blooming lotus” form designed by Heerim Architects. Image: Arup.
373,000m²
Terminal gross floor area
25m → 100m+
Passengers per year, phase 1 to ultimate
82m
Clear-span roof structure

Located 40km east of Ho Chi Minh City, Long Thanh is Vietnam’s largest modern international airport and its designated second gateway for the southern metropolis. Conceived by Heerim Architects in the form of a blooming lotus, the terminal presents one of the most geometrically complex structures in regional aviation.

Arup’s role

Arup is the structural engineering and civil engineering consultant for the detailed design stage of the terminal building — the engineering spine of the project, working inside a team led by the client’s own structures.

Delivery team

Heerim Architects & Planners (architect); Consultant & Inspection Joint Stock Company of Construction Technology and Equipment; NACO BV Airport Engineering Consultancy & Services via joint venture.

Arup — Regional Airport Capability · ASEAN07
06 · Case study — Vietnam

The engineering problem

The lotus-inspired form produces a highly complex roof geometry that had to be rationalised, analysed and detailed inside a tight programme. Arup’s structural team used digital modelling tools — Rhino/Grasshopper feeding the GSA analysis model — to keep the analysis model continuously updated as the geometry evolved.

What the role covered

Why it is relevant to a Lao programme

Long Thanh construction and data illustration
Long Thanh construction and data illustration. Image: Arup.
Source: arup.com — Long Thanh International Airport terminal building project page (accessed Nov 2026).
Arup — Regional Airport Capability · ASEAN08
06 · Case study — Vietnam

Capacity planning and future-proofing

Long Thanh is being designed for growth on a regional scale: phase one handles 25 million passengers a year, with infrastructure planned to scale beyond 100 million at ultimate completion. Arup’s assessment of airport planning parameters fed directly into the client’s decisions about flexible capacity and long-life infrastructure.

Transferable lessons

Long Thanh practiceApplication to Lao airport development
Phased capacity design (25m → 100m+ pax)Matches Lao airports needing affordable phase-one capacity with credible expansion paths
Digital-first structural workflow (Grasshopper/GSA)Fast iteration within tight government programmes
Integrated planning + engineering adviceSingle-point technical leadership across disciplines
Climate-resilient design criteriaMekong-region exposure to extreme weather and flooding
Working through local inspection consultantsFits Lao institutional and certification requirements

Long Thanh is under development; completion dates are set by the client and are not stated here. Arup’s role is detailed design engineering — not construction, financing or concession holding.

Arup — Regional Airport Capability · ASEAN09
07 · Case study — Singapore
02

Changi Airport Terminal 5

Singapore · Client: Changi Airport Group
Aerial view of Changi Terminal 5 design
Terminal 5 design — part of the 1,080-hectare Changi East development. Image: Changi Airport Group.
~50m
Passenger movements, phase 1
Mid-2030s
Expected operational date
Green Mark
Platinum Super Low Energy target

Arup’s role

In April 2018 Changi Airport Group appointed Arup Singapore, Mott MacDonald Singapore and Surbana Jurong Consultants as the engineering consortium for the Master Building Consultants — covering architectural engineering services for the Main Terminal Building, Satellite Terminal Building, Ground Transportation Centre and primary landside roadways. The same consortium forms the core of the Master Civil Consultants for landside and airside works.

Since 2023, Arup’s Singapore aviation team has led design integration across specialist engineering disciplines and airport planning on the project.

Milestone

T5 broke ground on 14 May 2025, officiated by Singapore’s Prime Minister. It is designed to operate flexibly as sub-terminals, linking to existing terminals via automated people mover.

Arup — Regional Airport Capability · ASEAN10
07 · Case study — Singapore

Scope of the engineering appointment

T5 is not a single building but a mini-city: a mega terminal, satellite terminal, ground transportation centre and an entire airfield and landside programme. Arup’s consortium appointment covers both sides of that boundary.

Building scope (Master Building Consultants)

Civil and airfield scope (Master Civil Consultants)

Sustainability benchmark

T5 targets Green Mark Platinum Super Low Energy certification, deploys one of Singapore’s largest rooftop solar systems, and is being designed for sustainable aviation fuel and fixed ground power readiness.

Sources: Changi Airport Group T5 project page; CAG consultant appointment announcement (Apr 2018); Mott MacDonald project news (May 2025); KPF project page.
Arup — Regional Airport Capability · ASEAN11
07 · Case study — Singapore

Why T5 demonstrates the model

T5 shows how Arup operates inside a consortium — the same delivery shape proposed for the Laos programme.

Feature of T5 deliveryWhat it proves
Multi-firm engineering consortium (Arup + Mott MacDonald + Surbana Jurong)Arup routinely shares delivery leadership inside consortia rather than insisting on sole appointment
Separate building and civil consultant tracksArup can hold integrated responsibility across building and airfield scopes
Design integration leadership since 2023Coordinates specialist engineering inputs across a multi-billion-dollar programme
Flexible, future-proofed terminal conceptDesigns for phased growth and operational adaptability
Green Mark Platinum SLE targetDelivers bankable sustainability credentials for government clients

Consortium composition and roles were determined by the client through competitive appointment — consistent with the client-led selection model this profile supports.

Arup — Regional Airport Capability · ASEAN12
08 · Case study — Singapore
03

Changi Airport Terminal 4

Singapore · Client: Changi Airport Group · Opened October 2017
Changi Terminal 4 exterior
Changi Terminal 4 — 16 million passengers a year capacity. Image: Arup.
16m
Passengers per annum
82m
Total Changi capacity after T4
100+
ORAT trials run before opening

Arup’s role

Appointed directly by Changi Airport Group, Arup conducted and facilitated the design, tendering and project management of the integrated information display system (IIDS) and the façade engineering design for Terminal 4 — working with SAA Architects on the building envelope and metal roof.

This is a systems-and-systems-integration appointment, not a structural one: passenger information, content management, glazing, sunshades and daylighting — the digital and environmental layer of a working terminal.

Arup — Regional Airport Capability · ASEAN13
08 · Case study — Singapore

Systems depth and opening-day assurance

T4 demonstrates two capabilities that matter for any new Lao terminal: airport IT and passenger systems, and operational readiness.

Information systems

Façade engineering

ORAT

Arup’s team stayed involved from pre-tendering through testing and commissioning, supporting more than 100 ORAT trials involving 2,500 staff and 7,500 volunteers before opening.

Changi T4 check-in area
T4 check-in hall. Image: Arup.
Changi T4 departures
T4 departures. Image: Arup.
Source: arup.com — Changi Airport Terminal 4 project page (accessed Nov 2026).
Arup — Regional Airport Capability · ASEAN14
09 · Case study — Laos
04

The Laos engagement

Phongsavanh Group · Ministry of Public Works and Transport
Aircraft at an airport at night
Arup’s Laos work sits inside national airport planning for a landlocked, aviation-dependent economy. Image: Arup.

2022 — national feasibility study

In September 2022, Phongsavanh Group (PSVG) and Arup Singapore signed an agreement for a detailed feasibility study on airport improvement and development in Laos. The signing was witnessed by the Minister of Public Works and Transport, implementing a June 2022 MOU between PSVG and the ministry’s Civil Aviation Department. Arup had been shortlisted from three international firms.

2025 — Luang Prabang PPP

PSVG, partnered with Arup Group Limited, was among 16 firms submitting expressions of interest for the Luang Prabang International Airport PPP — an IFC-advised procurement for expansion to four phases and approximately 3.6 million annual passengers.

Why this matters

Sources: Vientiane Times, 14 Sep 2022; MPWT EOI and procurement notices (2025); IFC programme documentation.
Arup — Regional Airport Capability · ASEAN15
10 · Beyond design

Delivery credentials

Airport programmes fail at the interfaces — design to construction, construction to systems, systems to opening day. Arup’s record covers those interfaces.

CredentialProjectWhat it demonstrates
Entire ORAT process led by ArupMumbai Airport Terminal 2, IndiaFull operational readiness ownership — trials, training, transition
First terminal with LEED v4 PlatinumSan Francisco Intl Airport T1, USAAirside civil, apron/taxiway design, sustainability certification
Multiple design awardsDublin Airport T2, Ireland15mppa terminal; Structural Steel Design Award 2010; ACEI President’s Award 2014
Airport city masterplanningNarita Airport City, Japan; Western Sydney, AustraliaLong-range strategic planning beyond the terminal fence
Passenger systems integrationChangi T4 IIDS/CMS (see case study)Information systems from business review through commissioning
Digital delivery at scaleLong Thanh terminal (see case study)Parametric modelling and rapid design iteration

Certification and standards

Arup’s project work is delivered to international certification regimes including LEED, BREEAM and national green-building schemes (Green Mark in Singapore), alongside ICAO-aligned aviation planning practice. Its ORAT methodology is a named, repeatable service.

Sources: arup.com — Aviation market page case studies and project pages (accessed Nov 2026).
Arup — Regional Airport Capability · ASEAN16
11 · Engagement

How the consortium would work with Arup

Arup’s value to this programme is not a single appointment — it is the ability to hold the Western technical scope together inside a consortium that also includes regional construction and local delivery.

Possible engagement shapes

What the partnership adds around Arup

Client-led selection preserved

None of the above pre-commits Arup or any other firm. The partnership’s function is to make the strongest combination of capabilities visible and governable — the client decides who is appointed, on what scope, and who leads.

Arup — Regional Airport Capability · ASEAN17
12 · Credits & sources

Sources and image credits

Project imagery

Facts and sources

Image rights

Imagery is reproduced from publishers’ public websites for the purpose of this capability profile. Arup and Changi Airport Group retain all rights; wider distribution of this document should be confirmed with the rights holders.

Contact

[TO COMPLETE — partnership contact details]
Prepared November 2026 · Capability summary only — no offer or commitment is made or implied.